Logo
Login Sign Up
Current Revision

API RP 2A-WSD (R2025) 22nd edition

Planning, Designing, and Constructing Fixed Offshore Platforms--” Working Stress Design
Best Price Guarantee
Instant

$491.00

2-5 Days

$491.00

SAVE 15%

$834.70


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


or
API RP 2A-WSD provides engineering guidelines for the safe design and construction of fixed offshore platforms using a working stress design (WSD) method, which involves applying factors of safety to loads and material strengths. It addresses elements like soil investigation, pile-soil interaction, structural member design, and tubular joint analysis to ensure platform integrity and reliability for the hydrocarbon industry.
SDO API: American Petroleum Institute
Document Number 2A-WSD
Publication Date Nov. 1, 2014
Language en - English
Page Count
Revision Level 22
Supercedes
Committee
Publish Date Document Id Type View
Nov. 1, 2014 RP 2A-WSD (R2025) 22nd edition Revision
Not Available Revision