API TR 934-J 2nd Edition

Current Revision
Inspection, Assessment, Effects of Operating Practices, Monitoring, and Repair of Coke Drums and Peripheral Components in Delayed Coking Units

Best Price Guarantee Sep 15, 2026 English 119 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
API TR 934-J 2nd Edition PDF Preview
API TR 934-J 2nd Edition
This technical report (TR) includes information on the practices used by industry on the inspection, assessment, effects of operating practices, monitoring, and repair of coke drums and peripheral components in delayed coking units. The information is general and does not reflect specific details associated with a design offered by licensors of delayed coking technology or inspection tools, repair techniques, and/or engineering assessments offered by contract.

The information provided in this document covers coke drums while in service, namely damage types, inspection, damage assessment, operating practices, effects, repairs, and life extension. This document complements information contained in API Technical Report 934-G, Design and Fabrication of Coke Drums and Peripheral Components in Delayed Coking Units.
Loading...

Failed to load document history.

Publish Date Document Id Type View