Logo
Login Sign Up
Current Revision

BSI BS ISO 23467:2020

Ice plug isolation of piping in nuclear power plant
Best Price Guarantee
Instant

$286.75

2-5 Days

$286.75

SAVE 10%

$516.15


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
British Standards Institution Logo

BSI BS ISO 23467:2020

Ice plug isolation of piping in nuclear power plant

PUBLISH DATE 2020
PAGES 24
BSI BS ISO 23467:2020

This document specifies requirements for the ice plug technique with liquid nitrogen or dry ice as refrigerant (cryogenic medium) on metal pipes of nuclear power plants. The freezing liquid can be water or water mixture (e.g. boric acid mixture).

This document specifies technical requirements of ice plug generation, formation judgment and removal, measures before, during and after ice plugging and requirements for personnel and non-destructive testing.

The application of the ice plug isolation technique is principally not allowed on cladded pipes or pipes with internal coatings. The application for pressure test is not in the scope of this document and will be qualified separately.

SDO BSI: British Standards Institution
Document Number ISO 23467
Publication Date Dec. 8, 2020
Language en - English
Page Count 24
Revision Level
Supercedes
Committee NCE/3
Loading...

Failed to load document history.

Publish Date Document Id Type View