Logo
Login Sign Up
Current Revision

BSI PD IEC/TS 62786:2017

Distributed energy resources connection with the grid
Best Price Guarantee
Instant

$310.76

2-5 Days

$310.76

SAVE 10%

$559.37


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
British Standards Institution Logo

BSI PD IEC/TS 62786:2017

Distributed energy resources connection with the grid

PUBLISH DATE 2017
PAGES 28
BSI PD IEC/TS 62786:2017

IEC TS 62786:2017(E) provides principles and technical requirements for distributed energy resources (DERs) connected to the distribution network.

It applies to the planning, design, operation, and connection of DERs to distribution networks.

It includes general requirements, connection scheme, choice of switchgear, normal operating range, immunity to disturbances, active power response to frequency deviation, reactive power response to voltage variations and voltage changes, EMC and power quality, interface protection, connection and start to generate electrical power, active power management, monitoring, control and communication, and conformance tests.

This document specifies interface requirements for connection of generating plants with the distribution network operating at a nominal frequency of 50 Hz or 60 Hz.

DERs include distributed generation and permanently connected electrical energy storage in the form of synchronous generators, asynchronous generators, converters, etc., connected to the medium voltage (MV) or low voltage (LV) distribution network.

SDO BSI: British Standards Institution
Document Number IEC/TS 62786
Publication Date June 22, 2017
Language en - English
Page Count
Revision Level
Supercedes
Committee GEL/8
Loading...

Failed to load document history.

Publish Date Document Id Type View