Logo
Login Sign Up
Current Revision

IEC 61850-4 Ed. 2.1 en:2020

Communication networks and systems for power utility automation - Part 4: System and project management
Best Price Guarantee

$808.50

2-5 Days

$808.50

SAVE 10%

$1,455.30


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
International Electrotechnical Commission Logo

IEC 61850-4 Ed. 2.1 en:2020

Communication networks and systems for power utility automation - Part 4: System and project management

PUBLISH DATE 2020
IEC 61850-4 Ed. 2.1 en:2020

Communication networks and systems for power utility automation - Part 4: System and project management

IEC 61850-4:2011+A1:2020 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS).

It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements.

This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems.

This consolidated version consists of the second edition (2011) and its amendment 1 (2020). Therefore, no need to order amendment in addition to this publication.

This publication is of core relevance for Smart Grid.

SDO IEC: International Electrotechnical Commission
Document Number IEC 61850
Publication Date Nov. 1, 2020
Language en - English
Page Count
Revision Level 2.1
Supercedes
Committee 57
Loading...

Failed to load document history.

Publish Date Document Id Type View