Logo
Login Sign Up
Current Revision

IEC/TS 63189-1 Ed. 1.0 en:2023

Virtual power plants - Part 1: Architecture and functional requirements
Best Price Guarantee

$201.74

2-5 Days

$201.74

SAVE 10%

$363.13


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
International Electrotechnical Commission Logo

IEC/TS 63189-1 Ed. 1.0 en:2023

Virtual power plants - Part 1: Architecture and functional requirements

PUBLISH DATE 2023
IEC/TS 63189-1 Ed. 1.0 en:2023

Virtual power plants - Part 1: Architecture and functional requirements

IEC TS 63189-1:2023 covers the terms and definitions, system composition and control modes of virtual power plant (VPP). It defines the functional requirements for VPPs, including:

  • power generation forecasting,
  • load forecasting,
  • generation and consumption scheduling,
  • control and management of energy storage devices and loads,
  • coordinated optimization of distributed energy resources,
  • status monitoring and communication,
  • data collection and analysis,
  • market transactions.

Since a virtual power plant is a cluster of dispersed energy converting installations, which are aggregated, it uses additional systems to achieve its objectives (e.g. regional energy meteorology forecasting, site specific energy management systems, SCADA and other communication systems).

Local regulations, the electricity market model and the corresponding manner of organising the market related to the utilisation of controllable DER affect the management, control and operation of VPPs.

SDO IEC: International Electrotechnical Commission
Document Number IEC/TS 63189
Publication Date Sept. 1, 2023
Language en - English
Page Count
Revision Level 1.0
Supercedes
Committee 8B
Loading...

Failed to load document history.

Publish Date Document Id Type View