IEEE/ISO/IEC 80005-1-2012

Current Revision
IEC/ISO/IEEE Utility Connections in Port--Part 1: High Voltage Shore Connection (HVSC) Systems--General requirements

Best Price Guarantee Jul 16, 2012 English 68 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
Institute of Electrical and Electronics Engineers Logo

IEEE/ISO/IEC 80005-1-2012

IEC/ISO/IEEE Utility Connections in Port--Part 1: High Voltage Shore Connection (HVSC) Systems--General requirements

PUBLISH DATE 2012
PAGES 68
IEEE/ISO/IEC 80005-1-2012

IEC/ISO/IEEE 80005-1-2012 describes high voltage shore connection (HVSC) systems, on board the ship and on shore, to supply the ship with electrical power from shore.

This standard is applicable to the design, installation and testing of HVSC systems and addresses:

  • HV shore distribution systems;
  • shore-to-ship connection and interface equipment;
  • transformers/reactors;
  • semiconductor/rotating converters;
  • ship distribution systems; and
  • control, monitoring, interlocking and power management systems.

It does not apply to the electrical power supply during docking periods, e.g. dry docking and other out of service maintenance and repair.

This part of IEC 80005 describes high voltage shore connection (HVSC) systems, on board the ship and on shore, to supply the ship with electrical power from shore.

This standard is applicable to the design, installation and testing of HVSC systems and addresses:

  • HV shore distribution systems;
  • shore-to-ship connection and interface equipment;
  • transformers/reactors;
  • semiconductor/rotating convertors;
  • ship distribution systems;
  • control, monitoring, interlocking and power management systems.

It does not apply to the electrical power supply during docking periods, e.g. dry docking and other out of service maintenance and repair.

Additional and/or alternative requirements may be imposed by national administrations or the authorities within whose jurisdiction the ship is intended to operate and/or by the owners or authorities responsible for a shore supply or distribution system.

It is expected that HVSC systems will have practicable applications for ships requiring 1 MW or more or ships with HV main supply.

Low-voltage shore connection systems are not covered by this standard.

This document is being developed jointly with IEC and will not have a purpose clause.

Loading...

Failed to load document history.

Publish Date Document Id Type View