ASHRAE Guideline 1.2-2019

Current Revision
Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

Best Price Guarantee 74 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
American Society of Heating, Refrigerating, and Air Conditioning Engineers Logo

ASHRAE Guideline 1.2-2019

Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

PAGES 70
ASHRAE Guideline 1.2-2019
ASHRAE Guideline 1.2 provides requirements for the application of the Commissioning Process (Cx) described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies.