ASHRAE Guideline 1.2-2019

Current Revision
Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

Best Price Guarantee 80 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00

You own the digital copy of this edition

View in Library
or
American Society of Heating, Refrigerating, and Air Conditioning Engineers Logo

ASHRAE Guideline 1.2-2019

Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

PAGES 80
ASHRAE Guideline 1.2-2019
This is a Spanish translation of Guideline 1.2, Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies. ASHRAE Guideline 1.2 provides requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies.
Loading...

Failed to load document history.

Publish Date Document Id Type View